Indian Trails Grove Zoning

Proposed Application Documents and Related Information For
Indian Trails Grove PUD

 

Back to Indian Trails Grove

 

Palm Beach West Associates I, LLLP, is the owner/developer of the land included in the Rezoning and Waiver request application PDD/W-2015-1457 for the property to be known as the Indian Trails Grove to a Planned Unit Development (PUD). The overall property includes approximately 4929.30 acres and is located approximately two (2) miles west of the intersection of Seminole Pratt Whitney Road and Orange Boulevard.

Concurrent with this application are Unified Land Development Code (ULDC) Text Amendments to acknowledge the RR-1.25 land use plan category and permit RR-1.25 land use plan category to follow the provisions of Article 3, Chapter E, Section 1 and Article 3, Chapter E, Section 2.A.-F. Other related amendments will be proposed, such as those that relate to the two product type requirement for PUDs, and location of commercial pods within a PUD, as they relate specifically to the RR-1.25 land use plan category.

Requests for Application Number PDD/W-2015-1457:

  • Official Zoning Map Amendment:  to allow a rezoning from the Agricultural Production (AP) and the Agriculture Residential (AR) Zoning District to the Planned Unit Development (PUD) Zoning District.
  • Type II Waiver:  to allow 65% of the local streets within the PUD to terminate in a cul-de-sac

 

Project Managers:

Roger Ramdeen, Senior Site Planner
Zoning Applications
561-233-5584
RRamdeen@pbcgov.org

William Cross, AICP,
Principal Site Planner
Unified Land Development Code Amendments
561-233-5566
wcross@pbcgov.org

 

Agent/Applicant:

Chris Barry, AICP,CUD, Senior Planner
Urban Design Kilday Studios
561-366-1100
cbarry@udkstudios.com

Palm Beach West Associates I,
LLLP by Palm Beach West I Corporation, General Partner c/o Kevin Ratterree,
Vice President

 


 

1.  Unified Land Development Code (ULDC): Privately Initiated Amendment (PIA) Application

  • Control Number 2002-90045
  • Application Number PIA 2015-01473
Initial Submittal July 15, 2015Re-submittal February 19, 2016 Re-submittal
ULDC PIA Application (Form #80)
Supplemental Table (Form #80)
Justification Statement
ULDC Amendment ExhibitULDC Amendment Exhibit

 

2.  Rezoning and Type II Wavier Application

  • Control Number: 2002-90045
  • Application Number: PDD/W 2015-01457
​Initial Submittal 07/15/2015 ​Re-submittal 09/28/2015 ​Re-submittal 02/22/2016
Consent FormConcurrency SupplementalConcurrency Supplemental
Civic Traffic ReportsGeneral ApplicationGeneral Application
General Application Justification StatementJustification Statement
Justification StatementPreliminary Phasing PlanPreliminary Phasing Plan
Preliminary Phasing Plan Preliminary Master Plan – OverallPreliminary Master Plan – Overall
Preliminary Master Plan - Overall Preliminary Master Plan – Pod A – Pg. 2Preliminary Master Plan – Pod A – Pg. 2
Preliminary Master Plan – Pod APreliminary Master Plan – Pod B – Pg. 3Preliminary Master Plan – Pod B – Pg. 3
Preliminary Master Plan – Pod BPreliminary Master Plans – Pod C – Pg. 4Preliminary Master Plans – Pod C – Pg. 4
Preliminary Master Plan – Pod CPreliminary Master Plan – Pod D – Pg. 5Preliminary Master Plan – Pod D – Pg. 5
Preliminary Master Plan - Pod DPreliminary Master Plan – Pod E – Pg. 6Preliminary Master Plan – Pod E – Pg. 6
Preliminary Master Plan – Pod EPreliminary Master Plan – Pod F – Pg. 7Preliminary Master Plan – Pod F – Pg. 7
Preliminary Master Plan – Pod F & Open Space – Pg. 1 Preliminary Master Plan – Pod F – Pg. 8 Preliminary Master Plan – Pod F – Pg. 8
Preliminary Master Plan – Pod F & Open Space – Pg. 2 Preliminary Regulating Plan – Pg. 1Preliminary Regulating Plan – Pg. 1
Preliminary Master Plan – Open Space Preliminary Regulating Plan – Pg. 2Preliminary Regulating Plan – Pg. 2
Preliminary Equestrian/ Pedestrian/Street Plan Preliminary Regulating Plan – Pg. 3Preliminary Regulating Plan – Pg. 3
Traffic Impact StatementPreliminary Regulating Plan – Pg. 4 Preliminary Regulating Plan – Pg. 4
Preliminary Regulating Plan – Pg. 5Preliminary Regulating Plan – Pg. 5
Preliminary Regulating Plan – Pg. 6Preliminary Regulating Plan – Pg. 6
Preliminary Regulating Plan – Pg. 7Preliminary Regulating Plan – Pg. 7
Preliminary Regulating Plan – Pg. 8Preliminary Regulating Plan – Pg. 8
Preliminary Regulating Plan – Pg. 9Preliminary Regulating Plan – Pg. 9
Preliminary Regulating Plan – Pg. 10Preliminary Regulating Plan – Pg. 10
Preliminary Regulating Plan – Pg. 11Preliminary Regulating Plan – Pg. 11
Preliminary Equestrian / Pedestrian / Street PlanPreliminary Equestrian / Pedestrian / Street Plan
Preliminary Master Sign Plan
Preliminary Open Space PlanPreliminary Open Space Plan

 

​Re-submittal 05/23/2016 ​Re-submittal 08/29/2016Re-submittal 09/26/2016
Drainage Statement Concurrency Supplemental Concurrency Supplemental
General Application​General Application General Application
Justification Statement Justification Statement Justification Statement
Preliminary – Phasing Plan Pre Equestrian Pedestrian Street Plan Pre Equestrian Pedestrian Street Plan
Preliminary Master Plan - Overall Preliminary Master Sign PlanPreliminary Master Sign Plan
Preliminary Master Plan – Pod A – Pg. 3 Pre MP Open Space Pre MP Open Space
Preliminary Master Plan – Pod B – Pg. 4 Pre MP OverallPre MP Overall
Preliminary Master Plan – Pod C – Pg. 5Pre MP Pod A - Pg. 2 Pre MP Pod A - Pg. 2
Preliminary Master Plan – Pod D – Pg. 6 ​Pre MP Pod B - Pg. 3 ​Pre MP Pod B - Pg. 3
Preliminary Master Plan – Pod E – Pg. 7 ​Pre MP Pod C - Pg. 4 ​Pre MP Pod C - Pg. 4
Preliminary Master Plan – Pod F – Pg. 8​Pre MP Pod D - Pg. 5​Pre MP Pod D - Pg. 5
Preliminary Master Plan – Pod F – Pg. 9 Pre MP Pod E - Pg. 6 ​Pre MP Pod E - Pg. 6
Preliminary Regulating Plan – Pg. 1 Pre MP Pod F - Pg. 7 ​Pre MP Pod F - Pg. 7
Preliminary Regulating Plan – Pg. 2Pre MP Pod F - Pg. 8 Pre MP Pod F - Pg. 8
Preliminary Regulating Plan – Pg. 3Pre Phasing PlanPre Phasing Plan
Preliminary Regulating Plan – Pg. 4​​Pre Regulating Plan - Pg. 1 ​​Pre Regulating Plan - Pg. 1
Preliminary Regulating Plan – Pg. 5 Pre Regulating Plan - Pg. 2Pre Regulating Plan - Pg. 2
Preliminary Regulating Plan – Pg. 6 Pre Regulating Plan - Pg. 3 Pre Regulating Plan - Pg. 3
Preliminary Regulating Plan – Pg. 7 ​Pre Regulating Plan - Pg. 4 ​Pre Regulating Plan - Pg. 4
Preliminary Regulating Plan – Pg. 8Pre Regulating Plan - Pg. 5 Pre Regulating Plan - Pg. 5
Preliminary Regulating Plan – Pg. 9 Pre Regulating Plan - Pg. 6Pre Regulating Plan - Pg. 6
Preliminary Regulating Plan – Pg. 10Pre Regulating Plan - Pg. 7Pre Regulating Plan - Pg. 7
Preliminary Master Plan – Open SpacePre Regulating Plan - Pg. 8 Pre Regulating Plan - Pg. 8
Preliminary Master Plan – Tabular DataPre Regulating Plan - Pg. 9 Pre Regulating Plan - Pg. 9
Preliminary Equestrian / Pedestrian / Street Plan Pre Regulating Plan - Pg. 10 Pre Regulating Plan - Pg. 10
Preliminary Master Sign Plan Pre Regulating Plan - Pg. 11 Pre Regulating Plan - Pg. 11
Preliminary Regulating Commercial Radius Pg. 11  
Preliminary Regulating Civic Radius Pg. 12  
Preliminary Regulating Recreation Radius Pg. 13  
Preliminary Regulating Open Space Pg. 14  

 

​Re-Submittal 10/24/2016 Re-Submittal 11/28/2016 Re-Submittal 12/15/2016
Justification Statement ​Justification StatementConsent Form
Preliminary Master Plan – Overall Preliminary Master Plan - Overall Justification Statement
Preliminary Master Plan – Pod A – Pg. 3 Preliminary Master Plan – Pod A – Pg.3 Preliminary Master Plan - Overall
Preliminary Master Plan – Pod B – Pg. 4Preliminary Master Plan – Pod B – Pg.4Preliminary Master Plan - Pod A - Pg.3
Preliminary Master Plan – Pod C – Pg. 5 Preliminary Master Plan – Pod C – Pg.5 Preliminary Master Plan - Pod B - Pg.4
Preliminary Master Plan – Pod D – Pg. 6Preliminary Master Plan – Pod D – Pg.6Preliminary Master Plan - Pod C - Pg.5
Preliminary Master Plan – Pod E – Pg. 7 Preliminary Master Plan – Pod E – Pg.7 Preliminary Master Plan - Pod D - Pg.6
Preliminary Master Plan – Pg. 8Preliminary Master Plan – Pod F – Pg.9Preliminary Master Plan - Pod E - Pg.7
Preliminary Master Plan – Pod F – Pg. 9Preliminary Master Plan – Open Space Preliminary Master Plan - Pg.8
Preliminary Regulating Plan – Pg. 2Preliminary Phasing PlanPreliminary Master Plan - Pod F - Pg.9
Preliminary Regulating Plan – Pg. 3 Preliminary Regulating Plan – Pg.2 Preliminary Master Plan - Open Space Pod - pg.10
Preliminary Regulating Plan – Pg. 4Preliminary Regulating Plan – Pg.3 Preliminary Phasing Plan
Preliminary Regulating Plan – Pg. 5Preliminary Equestrian / Pedestrian Street LayoutPreliminary Regulating Plan - Pg.2
Preliminary Regulating Plan – Pg. 6Preliminary Master Sign PlanPreliminary Regulating Plan - Pg.3
Preliminary Regulating Plan – Pg. 7Preliminary Regulating Buffer Key MapPreliminary Regulating Plan - Pg.4
Preliminary Regulating Plan – Pg. 8Preliminary Commercial /Civic / Recreational RadiusPreliminary Master Sign Plan
Preliminary Regulating Plan – Pg. 9Preliminary Conceptual Land Use DensityPreliminary Regulating Buffer Key Map
Preliminary Master Sign PlanPreliminary Commercial Radius Preliminary Commercial /Civic /Recreational Radius
Preliminary Master – Open Space PlanPreliminary Master Plan Tabular DataPreliminary Conceptual Land Use Density
Preliminary Phasing PlanPreliminary Open Space OverallPreliminary Commercial Radius
Preliminary Master Tabular DataPreliminary Master Plan Tabular Data
Preliminary Commercial – Civic – Recreation Density PlanPreliminary Open Space Overall
Preliminary Commercial Radius Plan
Preliminary Conceptual Land Use Density Plan
Preliminary Equestrian – Pedestrian Street Layout
Preliminary Regulating Buffer Key Map

 

Re-submittal 01/06/2017
Justification Statement
Preliminary Master Plan Overall
Preliminary Master Plan Pod A – Pg.3
Preliminary Master Plan Pod B – Pg.4
Preliminary Master Plan Pod C – Pg.5
Preliminary Master Plan Pod D – Pg.6
Preliminary Master Plan Pod E – Pg.7
Preliminary Master Plan – Pg.8
Preliminary Master Plan Pod F – Pg.9
Preliminary Regulating Plan – Pg.2
Preliminary Regulating Plan – Pg.3
Preliminary Phasing Plan
Preliminary Tabular Data
Preliminary Civic – Recreational and Radius
Preliminary Conceptual Land Use Density
Preliminary Commercial Radius
Preliminary Open Space - Overall
Preliminary Open Space
Preliminary Master Sign Plan
Preliminary Equestrian – Pedestrian Street Layout
Preliminary Buffer Key Map
Preliminary Conceptual Plan